Bobbitt Design Build
THINK • DESIGN • BUILD

THINK
  • Master planning
  • Site analysis and selection
  • Conceptual designs
  • Accurate budgeting based on history
  • Permitting and regulatory analysis
  • Timely permit acquisition
DESIGN
Engineering process:
  • Preliminary site planning
  • Site landscape design
  • Civil engineering
  • Structural engineering
  • Mechanical engineering
  • Electrical engineering

Architectural design process:
  • Preliminary designs
    • Space planning
    • Building design
    • Interior design
    • Materials/Finish selections
  • Preliminary code review
  • Detailed budgeting
  • Ongoing scheduling

Procurement process:
  • Subcontractor selection
  • Phased construction
  • Labor evaluation
  • Final permit acquisition
BUILD
Construction:
  • Project management
  • Cost-control
  • Subcontractor management
  • Scheduling
    • Pre-cast and poured concrete
    • Carpentry
    • Roofing
    • Steel fabrication
    • Paneling
  • Full-time safety coordinator
  • Client communication
    • Design and budget modifications

Quality assurance:
  • Define client objectives
  • Monitor for appearance and workmanship
  • Field inspection
  • Ongoing training

Final stage move-in:
  • Equipment installation
  • Standardized project check-off list
  • Finalize construction
  • Complete inspection
  • Occupancy
© 2008 Bobbitt Design Build, Inc.